Temecula, CA

This project consisted of two, five-story buildings, joined by a four-story Lobby Building, and a stand-alone Central Utility Building at the new 27-acre campus in Temecula, California. The new buildings surround a tree-filled courtyard and connect to the existing facility with a pedestrian bridge over a thoroughfare.

 Twining provided material testing and inspection services for the superstructure including structural steel welding, high strength bolting, non-destructive testing for welds, reinforced concrete, and fireproofing.

Back to Projects

Abbott Vascular Temecula East Campus

 Twining provided material testing and inspection services for the superstructure including structural steel welding, high strength bolting, non-destructive testing for welds, reinforced concrete, and fireproofing.