Skip to main content
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.

Cedars-Sinai, Marina Del Rey Replacement Hospital

Marina del Rey, CA
BG of Energy Industry

The replacement tower project consists of a nine-story hospital building and a total planned area of 310,000 square feet. The tower will provide an initial 96 patient beds, with two-shelled floors to add an additional 64 beds. The plan further reflects 28 emergency treatment rooms, 10 operation rooms, 2 cath labs, 2 endoscopy procedure rooms, 8 imaging modalities, and required administration and clinical support facilities. The Central Energy Plant component of the project will be founded on deep auger cast piles, which will support a 2-story, 20,000-square-foot structural steel frame with composite metal decks, reinforced masonry walls, and composite concrete fill.

Twining is providing the following engineering oversight, deputy inspection, and material testing services on a periodic, and/or continuous basis, in accordance the standard of care customary with HCAI projects:

  • Structural steel shop fabrication and Non-destruct Testing (NDT)
  • Structural Steel field visual inspection
  • Identify and inspect fabrication of reinforcing steel at the shop
  • Reinforced concrete- Twining Concrete Inspector(s) and ACI Technician
  • Batch Plant Inspection (Assumes full-time)
  • Spray-applied fireproofing
  • Epoxy dowels (periodic), wedge anchors (periodic), and embeds (periodic)
  • Inspection & Pull testing of post-installed anchors and wire hangers

Our scope of work also includes:

  • Prepare for issuance to the construction contractor, as required, written Notices of Non-Compliance using appropriate forms
  • Attend project progress meetings, and other special meetings as deemed by the project Inspector-of-Record
  • Provide hard-copy reports of all testing services performed to the client, HCAI, Structural Engineer, Architect and IOR, and material testing and special inspectors in hard copy
  • Respond to the project material and special inspectors scheduling, and coordination for special inspections, and sampling testing services. Provide sufficient copies to the project inspector. Distribution shall include Cedars-Sinai, HCAI, architect, and Inspector of Record (IOR)

Client
Cedars-Sinai
Services Provided
Special Inspection
Materials Testing Laboratories