City of Millbrae, Millbrae Upper Hillcrest Subbasin 4
This project is comprised of the removal and replacement of existing 6-inch or 8-inch sewer mains with 8-inch sewer mains using pipe reaming, pipe bursting, horizontal directional drilling (HDD), and open cut pipe replacement construction methods, sewer lateral reconnections & replacement, sewer manhole reconnections, cleanout and/or backflow prevention devices, sewer manhole installations and, surface restoration, traffic control, mobilization, manhole modifications, sewage bypassing, and all other work.